5.7 Start-up
44
Now switch both channels to pause and then parameterize the channels according to step two of
the following reference value table
Now start again with the same
procedure as point (1) and work
through all steps of the set point
table.
Then switch off the output relay,
the channels and finally the ERS
system.
After a waiting period of
at
least
3 minutes
and checking the DC
link voltage for <5V, the external
supply can be removed. Then in-
sert the fuses F1-F4 again with
the help of the installation tool.
Now switch on the main switch
and start the system
After booting, deactivate the ser-
vice mode in the PLC and set the
DC link voltage to 650
V in the
IBN interface.
Now parameterize the channels according to step 8 of the set point table and check the function of
the system once again; but now with active AFE.
Table 20 Set values external supply HTS
Step
1
2
3
4
5
6
V
set
auxiliary
supply
24
V
100
V
600
V
V
set
CH1
20
V
1
V
80
V
1
V
580
V
1
V
I
set
CH1
40
A
-10
A
40
A
-10
A
40A
-10
A
P
set
CH1
20
kW
-20
kW
20
kW
-20
kW
20
kW
-20
kW
Control mode
CH1
CV
CC
CV
CC
CV
CC
Direction CH1
Charge
Discharge Charge
Discharge Charge
Discharge
V
set
CH2
1
V
20
V
1
V
80
V
1
V
580
V
I
set
CH2
-10
A
40
A
-10
A
40
A
-10
A
40
A
P
set
CH2
-20
kW
20
kW
-20
kW
20
kW
-20
kW
20
kW
Control mode
CH2
CC
CV
CC
CV
CC
CV
Direction CH2
Discharge Charge
Discharge Charge
Discharge Charge
Commissioning has now been successfully completed and Operation can now be started.