4 Planning and installation – Installing the heating system
60
20.
Hang the upper side cladding (3) on the flue side with the pre-as-
sembled M6 Hexagon socket screws (1) (size 4) onto the front and
rear cladding.
21.
Secure the upper side cladding (3) on the flue side at the bottom
to the front cladding using the M6 Hexagon socket
screw (4) (size 4)
22.
Fasten the upper side cladding (3) on the flue side at the bottom
to the rear corner support with the M6 Hexagon socket
screw (2) (size 4).
I
NSTALLING
THE
REAR
CLADDING
23.
Install the lower rear cladding (2) with the M6 hexagon socket
screws (size 4) to the corner supports.
Figure 4/40 - Installing the side cladding on the flue gas pipe side at the top
4
1
2
3
Figure 4/41 - Installing the rear cladding
2
1
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 35 HDG Compact 45 50 65 HDG Compact 80 Operating manual ...
Страница 2: ......
Страница 6: ...Operation Manual HDG Compact 25 80 Content 6 ...
Страница 107: ......