![HDG Compact 25 Скачать руководство пользователя страница 86](http://html.mh-extra.com/html/hdg/compact-25/compact-25_operating-manual_2112438086.webp)
7 Cleaning and servicing the heating system – Requirements
86
4.
Release the star-grip screws (1).
5.
Lift up the lid (4) and remove it.
6.
Check the fill level of the ash containers (3).
7.
If the ash containers (3) are full, empty them.
8.
Fasten the transport handle (5) on the ash container (3).
9.
Lift up the clamp handle (2) and release the ash container (3).
10.
Pull the ash container (3) forward out of the ash channel of the ash
removal system.
11.
Empty the ash into a fireproof container.
12.
If the ash containers (3) are not yet full, reclose them.
13.
Mount the lid (4) on the ash container (3) and install the ash con-
tainer (3) in the boiler in the reverse sequence.
14.
Repeat the process for the second ash container.
✎
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.2 Switching on the heating system”.
✓
Inspection and emptying of the ash containers has been com-
pleted.
Figure 7/6 - Checking and empty the ash container
3
2
5
1
4
Caution!
Damage from smoke
If the ash necks are empty or the ash containers are not at least half-
filled when commissioning or re-starting after cleaning, there is a
danger of smoke coming from the boiler.
Make sure that both ash containers or the ash necks are at least half-
filled with ash or sand.
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 35 HDG Compact 45 50 65 HDG Compact 80 Operating manual ...
Страница 2: ......
Страница 6: ...Operation Manual HDG Compact 25 80 Content 6 ...
Страница 107: ......