4 Planning and installation – Installing the heating system
66
12.
Attach the lower side cladding (2) on the feed side to the rear
corner support with the M6 hexagon socket screws (5) (size 4).
13.
Screw the M6 hexagon socket screw (4) (size 4) loosely into the
side cladding so that the rear cladding can be attached later.
14.
Hang the upper side cladding (2) on the feed side on the outer
connecting plate with the pre-assembled M6 hexagon socket
screws (1) (size 4).
15.
1Fasten the upper side cladding (2) on the feed side at the bottom
to the front cladding with the M6 Hexagon socket
screws (3) (size 4).
16.
Secure the upper side cladding (2) on the feed side at the bottom
to the rear corner support using the M6 Hexagon socket screws (4)
(size 4).
17.
Screw the M6 hexagon socket screw (5) (size 4) loosely into the
side cladding so that the rear cladding can be attached later.
Figure 4/53 - Installing the side cladding on the feed side at the top
3
6
4
5
1
2
Figure 4/54 - Installing the side cladding on the flue gas pipe side at the bottom
5
1
3
6
4
2
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 35 HDG Compact 45 50 65 HDG Compact 80 Operating manual ...
Страница 2: ......
Страница 6: ...Operation Manual HDG Compact 25 80 Content 6 ...
Страница 107: ......