4 Planning and installation – Installing the heating system
48
7.
Fit the left (1) and the right (3) tray on the centre tray (2).
8.
Fit the two moving ash floors (1 + 5) on the trays.
9.
Connect the two moving ash floors (1 + 5) by means of the bracket
(3) with the M10 screws (17 mm).
10.
Install the two guide plates (2 + 4) with the M8 screws (13 mm)
with the spacer plates (6 + 7) underneath.
I
NSTALLING
THE
ASH
REMOVAL
AUGER
11.
Install the bracket (5) on the moving ash floor with M10 screws (17
mm).
12.
Insert the ash removal auger with the long shaft end (3) from the
front on the feed side through the opening (1) provided for this.
13.
Insert the second ash removal auger with the short shaft end (4)
through the opening (2) provided for this.
Figure 4/19 - Installing the ash walking floor delivery system
7
6
1
3
2
5
4
Figure 4/20 - Installing the ash removal auger
4
3
5
1
2
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 35 HDG Compact 45 50 65 HDG Compact 80 Operating manual ...
Страница 2: ......
Страница 6: ...Operation Manual HDG Compact 25 80 Content 6 ...
Страница 107: ......