![HDG Compact 25 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/hdg/compact-25/compact-25_operating-manual_2112438050.webp)
4 Planning and installation – Installing the heating system
50
M
OUNTING
THE
ASH
REMOVAL
DOOR
24.
Slide the ash removal door (5) onto the two ash removal
augers (1).
25.
Tighten the ash removal door (5) with the long screw (3) and four
short M12 screws (2 + 4) (19 mm) and the M12 washers evenly.
26.
If necessary, align the ash removal augers (1) with the screws of
the ash removal door (2 + 4).
✓
The ash removal system is installed.
I
NSTALLING
THE
HEAT
EXCHANGER
CLEANER
I
NSTALLING
THE
CROSSBEAMS
1.
Release the pre-mounted M12 nuts (size 19) from the short or long
crossbeam.
2.
Place the two crossbeams (1) on the turbulators in the cleaning
shaft.
Figure 4/22 - Mounting the ash removal door
5
1
4
2
3
Important!
The two ash removal augers must not come into contact with the
ash removal door when installed.
Because of the soft seal, the screws should not be screwed in up to
the stop. Only tighten until a resistance is detected.
Figure 4/23 - Installing the crossbeams
1
3
2
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 35 HDG Compact 45 50 65 HDG Compact 80 Operating manual ...
Страница 2: ......
Страница 6: ...Operation Manual HDG Compact 25 80 Content 6 ...
Страница 107: ......