Installation
Installation Steps
DANGER of Death, Injury or Property Damage if procedure not followed.
Power wiring must
be shut off before attempting to install the VS Omni.
The VS Omni is designed to be mounted outdoors at the pool pad. Both the Hub and the Control
Pad are water resistant and can be left out for the winter. Details on each installation step are
shown below:
1. Mounting the equipment (page 7)
VS Omni Hub
Control Pad
Smart Relay
Temperature sensors
Valve actuators (if applicable)
2. Plumbing (page 9)
General Pool Equipment
Flow Switch
3. Electrical Wiring (page 10)
Hub power
Grounding
Low voltage wiring (Pool Pump Communication, Heater, Smart Relays, Temperature Sensors,
Flow Switch, etc.)
5. System Startup and Firmware Upgrade (page 22)
The most common installation technique is described in the included Quick Start Guide. Use this
guide if possible. If the Guide can not be applied to your particular installation, refer to the additional
information in this manual.
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
6