![Gree GMV5 Series Скачать руководство пользователя страница 154](http://html1.mh-extra.com/html/gree/gmv5-series/gmv5-series_service-manual_2260367154.webp)
GREE Photovoltaic Direct-driven Inverter Multi VRF Units
150
2) Solution of project number conflict:
①
Manual setting on the commissioning software:
Use the commissioning software to set IDUs' project numbers separately in every system or reset
projects numbers in multiple systems.
Choose Setting -> Parameter Settings, as shown in Figure 2:
Figure 2
If project commissioning is finished and the IDU where the conflict occurs needs to be set separately.
Click Project Number Conflict, as shown in Figure 3. The pop-up box comprises two parts: conflicting
IDU box, showing the IDU's project number, system number and time; setting box, showing the IDU
project number setting and setting button.
Figure 3
Choose one IDU in the conflicting IDU box shown in Figure 3 and click Set in the setting box.
Choose a value in the pop-up box shown in Figure 4 and click Set.
Содержание GMV5 Series
Страница 87: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 83 GMV Y96WM C F U and GMV Y120WM C F U ...
Страница 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Страница 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Страница 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Страница 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Страница 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Страница 277: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 273 Components of oil balance valve 2 ...
Страница 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Страница 321: ...JF00303868 ...