GREE Photovoltaic Direct-driven Inverter Multi VRF Units
109
Step 2: Press "SW7" to send the project number offset command. The master module is displayed
as follows:
LED1
LED2
LED3
Function Code
Display Mode
Current Progress/Mode
Display Mode
Current Status
Display Mode
n5
On
00
On
OC
On
After 10 seconds, the system quits this mode and restores the normal operation mode.
NOTE:
This function only needs to be set on the master system, which is the system with the
centralized control address SA2 DIP switch being "00000". For details, see the "Centralized Control
Address DIP Switch (SA2_Addr-CC)" section.
1.3.4 Function Query Operations
Step 1: Open the commissioning window of the master unit panel.
Step 2: Power on the entire unit.
Step 3: Press "SW4" on the master unit to enter the query status.
Step 4: Select a function to be queried by pressing "SW1 (UP)" or "SW2 (DOWN)" on the master
unit. By default, the A7 outdoor silent mode is displayed for query.
For example, select the A6 unit cooling/heating function. The display is as follows:
LED1
LED2
LED3
Function
Code
Display
Mode
ODU Function Mode
Code
Display
Mode
ODU Function Mode
Code
Display
Mode
A6
On
nA
On
nA
On
ED1
LED2
LED3
Function Code
Display Mode
Current Progress/Mode
Display Mode
Current Status
Display Mode
n8
Blinking
00
Blinking
00
Blinking
Press "SW7" and select the IDU project number query on the master unit. The master unit is
displayed as follows. Other modules are displayed in normal status.
LED1
LED2
LED3
Function Code
Display Mode
Current Progress/Mode
Display Mode
Current Status
Display Mode
n8
On
00
On
00
On
Regardless of the current display status of wired controllers or display panels of all IDUs, the current
display status is all switched to the IDU project number. However, it does not influence the settings and
operation status of outdoor and IDUs.
On the master unit, press "SW6" to return to the upper level. The IDU retains the project number
display status.
On the master unit, press and hold "SW6" to quit the address display status for all IDUs and return
to the upper level.
If no quit button operations are performed on the master unit for 30 minutes, the function setting
automatically quits and the unit restores the current status.
Step 6: If the n9 IDU address query is selected, the display is as follows:
LED1
LED2
LED3
Function
Code
Display
Mode
Number of IDUs (Thousands-place
Hundreds-place)
Display
Mode
Number of IDUs
(Tens-place Ones-place)
Display
Mode
n9
On
00
On
00
Blinking
Содержание GMV5 Series
Страница 87: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 83 GMV Y96WM C F U and GMV Y120WM C F U ...
Страница 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Страница 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Страница 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Страница 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Страница 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Страница 277: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 273 Components of oil balance valve 2 ...
Страница 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Страница 321: ...JF00303868 ...