GREE Photovoltaic Direct-driven Inverter Multi VRF Units
122
Cooling mode when the outdoor environment temperature is higher than 20°C(68
℉
).
Heating mode when the outdoor environment temperature is lower than 20°C(68
℉
).
(3) Before starting commissioning, make sure again that stop valves of all basic modules of the
ODU have been completely opened.
(4) During commissioning, the front panel of ODU must be completely covered. Otherwise,
commissioning accuracy may be affected (as shown in the following figure).
(5) Before commissioning, make sure that appending refrigerants to pipes has finished completely
or for more than 70%.
(6) The following table describes progress display of each phase during commissioning:
Progress Description for Commissioning Phases
——
Commissioning Code Progress Code
Status Code
Meaning
Progress
LED1
LED2
LED3
Code
Display
Status
Code Display
Status
Code
Display
Status
01_Master unit
setting detection
db
On
01
On
A0
On
The system is in
non-commissioning status.
db
On
01
On
CC
On
The system does not set any
master unit, and a master unit
should be set.
db
On
01
On
CF
On
The system sets more than two
master units, and a master unit
should be set again.
db
On
01
On
OC
On
The system successfully sets a
master unit and automatically
enters the next step.
02_Unit address
assignment
db
On
02
On
Ad
Blinking The system is assigning
addresses.
db
On
02
On
L7
Blinking
There is not any master IDU, and a
master IDU should be set through
the commissioning software. If no
master IDU is set within one minute,
the system will automatically set
one.
db
On
02
On
OC
On
The system successfully assigns
addresses and automatically
enters the next step.
03_Basic module
quantity
confirmation for
ODU
db
On
03
On
01-04
Blinking
LED3 displays the module quantity,
which should be manually
confirmed.
db
On
03
On
OC
On
The system confirms the module
quantity and automatically enters
the next step.
04_Indoor unit
quantity
confirmation
db
On
04
On
01-80
Blinking
LED3 displays the IDU quantity,
which should be manually
confirmed.
db
On
04
On
OC
On
The system confirms the IDU
quantity and automatically enters
the next step.
Содержание GMV5 Series
Страница 87: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 83 GMV Y96WM C F U and GMV Y120WM C F U ...
Страница 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Страница 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Страница 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Страница 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Страница 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Страница 277: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 273 Components of oil balance valve 2 ...
Страница 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Страница 321: ...JF00303868 ...