Progress Description for Commissioning Phases
——
Commissioning Code Progress Code
Status Code
Meaning
Progress
LED1
LED2
LED3
Code
Display
Status
Code Display
Status
Code
Display
Status
05_Internal
communication
detection for
basic modules
db
On
05
On
C2
On
The system detects
communication failure between
master unit and inverter
compressor driver.
db
On
05
On
C3
On
The system detects
communication failure between
master unit and inverter fan driver.
db
On
05
On
CH
On
The rated capacity ratio is
over-high between IDUs and
ODUs.
db
On
05
On
CL
On
The rated capacity ratio is over-low
between IDUs and ODUs.
db
On
05
On
OC
On
The system completes detection
and automatically enters the next
step.
06_Internal
component
detection for
basic modules
db
On
06
On
Corresponding
fault code
On
The system detects component
failure of ODU.
db
On
06
On
OC
On
The system detects that no ODU
component fails and automatically
enters the next step.
07_Component
detection for IDU
db
On
07
On
XXXX/
Corresponding
fault code
On
The system detects component
failure of IDU. "XXXX" indicates
the project number of the faulty
IDU. The corresponding fault code
is displayed after three seconds.
For example, if a d5 fault occurs on
IDU 100, LED3 will circularly
display "01", "00" (two seconds
later), and "d5" (two seconds later).
db
On
07
On
OC
On
The system detects that no IDU
component fails and automatically
enters the next step.
08_Compressor
preheating
confirmation
db
On
08
On
U0
On
The system gives a prompt if the
compressor preheating period is
less than eight hours.
db
On
08
On
OC
On
The system detects that the
compressor preheating period is
more than eight hours and
automatically enters the next step.
09_Pre-startup
refrigerant
detection
db
On
09
On
U4
On
The system detects insufficient
refrigerants and stops to balance
the pressure lower than 0.3 MPa.
db
On
09
On
OC
On
The system detects that
refrigerants are normal and
automatically enters the next step.
10_Pre-startup
ODU valve status
detection
db
On
10
On
ON
On
Outdoor unit valves are being
opened.
db
On
10
On
U6
On
Outdoor unit valves have not been
completely opened.
db
On
10
On
OC
On
Outdoor unit valves have been
properly opened.
11_Manually
calculated
refrigerant
perfusion status
db
On
11
On
AE
On
The refrigerant perfusion status is
manually calculated (appended
refrigerants must be accurately
calculated).
12_Unit
commissioning
startup
confirmation
db
On
12
On
AP
Blinking The system waits for a unit
commissioning startup command.
db
On
12
On
AE
On
The unit is set to
manually-calculated refrigerant
perfusion commissioning operation
status.
Содержание GMV5 Series
Страница 87: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 83 GMV Y96WM C F U and GMV Y120WM C F U ...
Страница 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Страница 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Страница 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Страница 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Страница 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Страница 277: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 273 Components of oil balance valve 2 ...
Страница 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Страница 321: ...JF00303868 ...