GREE Photovoltaic Direct-driven Inverter Multi VRF Units
129
Corresponding faults include:
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status
Code
Display
Status
07_Component
detection for IDU
db
On
07
On
XXXX/
Corresponding
fault code
On
The system detects
component failure of
IDU.
"XXXX" indicates the project number of the faulty IDU. The corresponding fault code is displayed
after three seconds. For example, if a d5 fault occurs on IDU 100, LED3 will circularly display "01", "00"
(two seconds later), and "d5" (two seconds later).
For details about the above troubleshooting method, refer to the "Troubleshooting Method" part.
Step 12: Unit commissioning step 08 is compressor preheating confirmation.
If it is detected that the compressor preheating period is more than eight hours, the main board is
displayed as follows and the unit automatically enters the next step.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status Code Display Status
08_Compressor
preheating
confirmation
db
On
08
On
OC
On
The system detects
that the compressor preheating
period is more than eight hours and
automatically enters the next step.
If it is detected that the compressor preheating period is less than eight hours, an exception is
prompted and the main board is displayed as follows.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status Code Display Status
08_Compressor
preheating
confirmation
db
On
08
On
U0
On
The system gives a prompt if
the compressor preheating
period is less than eight hours.
Before starting commissioning, the outdoor unit must be power-on for more than 8 hours.
Otherwise, compressor may be damaged.
During daily operation, please keep the outdoor unit power-on at any time.
If unit is power-off for more than 24 hours, it must be preheated for at least 8 hours before
operation.
Step 13: Unit commissioning step 09 is pre-startup refrigerant confirmation.
If the refrigerant volume meets the system startup requirements, the main board is displayed as
follows and the unit automatically enters the next commissioning step.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status Code Display Status
09_Pre-startup
refrigerant
detection
db
On
09
On
0C
On
The system detects that
refrigerants are normal and
automatically enters the next
step.
If no refrigerant exists in the system or the refrigerant volume does not meet the system startup
Содержание GMV5 Series
Страница 87: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 83 GMV Y96WM C F U and GMV Y120WM C F U ...
Страница 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Страница 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Страница 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Страница 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Страница 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Страница 277: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 273 Components of oil balance valve 2 ...
Страница 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Страница 321: ...JF00303868 ...