GREE Photovoltaic Direct-driven Inverter Multi VRF Units
130
requirements, "U4 lack of refrigerant protection" is prompted and the main board is displayed as follows.
The unit cannot enter the next commissioning step. In this case, check for leakage or append
refrigerants till the exception disappears.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status Code
Display Status
09_Pre-startup
refrigerant
detection
db
On
09
On
U4
On
The system detects
insufficient
refrigerants and
stops to balance the
pressure lower than
0.3 MPa.
Step 14: Unit commissioning step 10 is pre-startup ODU valve status detection.
If the master unit is displayed as follows, it indicates that the unit is being enabled.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status Code Display Status
10_Pre-startup ODU
valve status detection
db
On
10
On
ON
On
Outdoor unit valves are
being opened.
If the master unit is displayed as follows, it is required to check again whether the ODU valves are
completely opened.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code
Display Status Code Display Status Code Display Status
10_Pre-startup ODU
valve status detection
db
On
10
On
U6
On
It is required to check
again whether the ODU
valves are completely
opened.
After confirming that all valves are completely opened, press "SW7" to enter the next commissioning
step.
If it is detected that the unit valve status is normal, the main board is displayed as follows and the
unit automatically enters the next commissioning step.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code
Display Status Code Display Status Code Display Status
10_Pre-startup
ODU valve status
detection
db
On
10
On
OC
On
Outdoor unit valves
have been properly
opened.
Step 15: Unit commissioning step 11 is manually calculated refrigerant perfusion status.
Without operations, the system gives a function prompt and automatically enters the next step.
Step 16: Unit commissioning step 12 is unit commissioning startup confirmation.
To avoid enabling the unit before all preparations are completed, it is required to confirm again
whether to enable the unit.
If the master unit is displayed as follows, it indicates that the unit is waiting for enabling confirmation.
Progress
Commissioning Code
Progress Code
Status Code
Meaning
LED1
LED2
LED3
Code Display Status Code Display Status Code
Display Status
12_Unit
commissioning
startup confirmation
db
On
12
On
AP
Blinking
The system waits for a
unit commissioning
startup command.
Содержание GMV5 Series
Страница 87: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 83 GMV Y96WM C F U and GMV Y120WM C F U ...
Страница 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Страница 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Страница 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Страница 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Страница 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Страница 277: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 273 Components of oil balance valve 2 ...
Страница 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Страница 321: ...JF00303868 ...