
•Page
globalcontract.com
92
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
L2B2Hxxxx • Bookcase
Required Tools
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Safety Glasses
Rubber Mallet
Screwdriver #2 Phillips
Screwdriver #2 Robertson
Included Hardware
Connecting Dowel
L004250004
Connecting Cam
L007250002
“L” Bracket
L005650065
“L” Bracket
L005650064
Shelf Support Pin
L007250013
L2B3Hxxxx
L2B4Hxxxx
L2B5Hxxxx
L2B6Hxxxx
Assembly
STEP 1: Unpack and inspect individual pieces for damages or missing hardware
STEP 2: Pick a clean unobstructed area to assemble desk. It is advisable to as-
sembly of this product upright.
STEP 3: Lay bottom piece down with connecting cams facing up.
a. Lay baseboard along front edge (edge without quick fi t cam). Space
baseboard with equal overhang on both sides and insure that the top edge
of baseboard and the top of bottom shelf are aligned. Using the Small “L”
bracket and #8 x ¾ wood screws, secure as shown.
STEP 4: Lay back panel on ground face up, insert connecting dowel in bottom
center pre-drilled hole.
a. Connect bottom assembly to the back board by lining up connecting
dowel to connecting cam as shown. Using screwdriver, turn connecting
cam to 2 O’clock position to secure.
STEP 5. Lay either left or right end panel on ground with exposed holes
for shelf adjustment facing up. Insert connecting dowels in pre-drilled
holes on perimeter.
a. Pick up assemble pieces and line up connecting dowels with connecting
cams. Using screwdriver, turn cam to 2 O’clock position to secure.
STEP 6: Repeat for opposite side.
STEP 7: On the bottom, install one large “L” bracket in each corner using #8 x ¾
woods screws provided. Install levellers into T nut inserts, use mallet to install in
pre-drilled holes on left and right end panels
STEP 8: Stand assembly upright.
STEP 9: Install connecting dowels in pre-drilled holes on top edge of the end panels
and the back panel. Place top panel onto assembly lining up the connecting dowels
with the connecting cam. Using screwdriver, turn quick fi t cam to 2 O’clock position
to secure.
STEP 10: Arrange shelf support pins as required and install shelves. Note that you
are able to secure shelves in place by screwing the shelf support pin to the under-
side of the shelf after fi nal positioning has been done.
Leveler
L007250037
“T” Nut Insert
L007250039
TOP
SHELF
BOTTOM
BACK BOARD
END PANEL
END PANEL
BASEBOARD
Installation For Similar Products
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...