
•Page
globalcontract.com
78
GLOBAL
Contract
• Fall 2017
viceversa®
Safety Glasses
Allenkeys
Rubber Mallet
Nylon Block
Screwdriver
Metal Pick
Required Tools
Leg attachment to surface
STEP 1: Place the worksurface on the fl oor upside down.
IMPORTANT:
Ensure there are no foreign items on the fl oor that could damage the fi nish of the
surface. It is recommended the installation of the legs be done on either a padded
blanket or cardboard.
STEP 2: Position the appropriate leg(s) over the 4 metal inserts located in the
worksurface, and attach with supplied bolts. Use 2 wood screws (1”x#10) to lock
each leg into position.
STEP 3: Once all legs are attached securely, invert the completed unit, locate it ac-
cording to the installation plan.
STEP 4: The unit can now be leveled. There are nine holes on each leg for the pur-
pose of adjusting the height of the unit. The holes are located at 1” increments.
STEP 5 For fi ne-tuning of leveling, simply turn the leveling glide on the bottom of
the leg, or caster, until level is accomplished.
STEP 6: To change the leveling glide to a caster, or locking caster, remove the exist-
ing casting by threading it all the way out of the leg. Screw in the desired product,
and level as above.
1
2
3
4
5
6
INSTALLATION GUIDELINES
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...