
•Page
globalcontract.com
16
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Assembly
L2ERHxxxxFR
L2ERHxxxxBL
L2ERxxxxBR
STEP 1: Unpack and inspect individual pieces for damages or missing hardware
STEP 2: Pick a clean unobstructed area to assemble desk. It is advisable to as-
sembly of this product upright.
STEP 3: Handles for Pedestals are Shipped Installed on the inside of the cabinet.
Remove handle from the inside of the cabinet and re-install with the same screws
on the front of cabinet.
a. Levellers for pedestals are shipped inside the unit. These levellers should
be installed prior assembling complete unit.
STEP 4: Arrange Pedestal and gable as per the fi nal confi guration of the product.
a. Using a 1/8” drill bit, drill though holes into side of pedestal according to
the provided template on the side of the pedestal exposed to the underside
of the desk. For this application, use the half modesty and fl ush panel location.
b. Modular screws are to be installed into these holes.
STEP 5: The modesty panel comes with Modular connectors installed to connect
to the Pedestal. On the top edge of the modesty panel, install Blum Connector
screws into the pre-drilled holes.
• There are 2 holes here, select hole closest to underside of assembly to
correctly line up with the Blum Connectors.
STEP 6: Attach the modesty panel to the pedestals by lining up modular con-
nectors to screws installed on the pedestal, lift modesty and slide into position
ensuring to engage connectors to screws. You can use a mallet to securely seat
the modesty panel into position.
STEP 7: To install the worksurface top. The worksurface comes with Blum
Connectors pre-installed on the bottom of the surface. Lift worksurface over the
assembly and line up Blum connectors to the installed Blum connector screws on
the modesty panel. Turn screw on Blum Connector ¼ turn, do not over tighten
a. You must also secure the worksurface top to the pedestal. Line up the
top fl ush to the side and front of the pedestal. Use #8 x 3/4 wood screws
provided, screw through the mounting bar on the pedestal to secure the
top. Note: Drawers need to be removed to access drilling location.
STEP 8: This unit is intended to be attached to an adjoining assembled unit at the
open end using the provided Flat Brackets. The Flat Brackets are screwed into
ganged assemblies at the worksurface joint using #8 x ¾ wood screws.
STEP 9: When fi nal position has been located, level the unit with the levellers
installed on the pedestal.
L2ERH-FL
Safety Glasses
Required Tools
Screwdriver #2 Phillips
Rubber Mallet
Level
Included Hardware
Modular Screw
L007250001
Wood Screw #8 3/4
L007250032
Screwdriver Roberson
92.2mm
96mm
102.7mm
9.5mm
162mm
FULL HEIGHT
MODESTY
HALF HEIGHT
MODESTY
FLUSH MOD
6” REC MOD
Installation For Similar Products
Leveler
L007250037
Blum Connector
Screw L005650060
Flat Bracket
L005650025
Blum Connector
(installed) L005650061
Modular Connector
(installed) L004250001
FF PED
HALF MODESTY
L2ERHxxxxBL
WORKSURFACE
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...