
•Page
globalcontract.com
26
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
L2GDP
Safety Glasses
Required Tools
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
#4 & 5 Hex Wrench
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Assembly
STEP 1: Unpack and inspect individual pieces for damages or missing hardware
STEP 2: Pick a clean unobstructed area to assemble desk.
STEP 3: Orient left and right side panels, note that the holes for connectors face
underside of desk with the quick fi x cams to the back.
a. install levellers into T nuts on the bottom of both side gables.
b. Install connecting dowels in pre-drilled holes exposed near back edge
and horizontally to connect lower shelf.
STEP 4: Back panel, Install levellers into T nut inserts on the bottom of the panel.
Orient panel with holes for hardware to the underside of the desk.
a. Install Connecting dowels into row of pre-drilled holes horizontally
approximately 8” from the top.
STEP 5: Pigeon hole lower shelf, line up connecting dowels on back panel to quick
fi x cams on lower shelf. Insure that Quick fi x cams are facing down, turn quick fi x
cam to 2 o’clock position to secure.
STEP 6: Connect the side panels aligning the connecting dowels with the quick fi x
cams. Turn quick fi x cam to 2 o’clock position to secure. Do this to both sides. Lay
assembly down with outside facing up.
STEP 7: There are 6 exposed through holes with routered out “seats” for Spacers.
Place each of the 6 spacers into these positions.
STEP 8: Pick up decorative panel, align installed nutserts on the back of this panel
with the spacers and place into position.
a. From under the assembly, insert the socket screws through exposed
holes and spacers into the T nut inserts on the decorative panel, tighten
using hex wrench.
b. Stand assembly upright.
STEP 9: On lower shelf, install connecting dowels and wood dowels. Starting from
left to right , connecting dowels will be used for the fi rst divider, the second panel
will use wood dowels. Continue with pattern.
a. On the top of the shelf dividers, install wood dowels into pre-drilled holes
for divider 2 & 4.
STEP 10: Insert the connecting dowels into the pre-drilled holes on the bottom of
the surface. Note that positions 2 & 4 will connect with wood dowels, do not install
connecting dowels in these corresponding locations.
a. place top panel onto assembly aligning the connecting dowels with the
quick
fi x cams. Turn quick fi x cam to 2 o’clock position to secure.
STEP 11: This product is intended to be installed over a standard Licence shell.
Place into position and level both units together.
a. Drill a through hole using a 9.5mm bit though the side panel and gable
on the desk you attaching too. This hole should be centered front to back
and 12-15” from fl oor. Using the Connector Bolt cap and Connector Nut,
secure each side and tighten with hex wrench.
Included Hardware
Socket Screw
L005650180
Spacer
L005650117
Connecting Dowel
L004250004
Connecting Cam
L002250002
Leveler
L007250037
Connector Bolt
L005650114
Connector Nut
L005650117
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...