
Page
•
globalcontract.com
89
• Fall 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
L2PBBFxx
L2PBBFxxMIT
Assembly
Assembly
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Handles for Pedestals are Shipped Installed on the inside of the cabinet.
Remove handle from the inside of the cabinet and re-install with the same screws
on the front of cabinet.
a. Levellers for pedestals are shipped inside the unit. Install in threaded
brackets on the bottom of the unit and level accordingly.
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Handles for Pedestals are Shipped Installed on the inside of the cabinet.
Remove handle from the inside of the cabinet and re-install with the same screws
on the front of cabinet.
a. Casters are shipped installed.
* Freestanding Storage Including
Pedestals, Freestanding and worksurface supporting CPU Units
Laterals, Freestanding and Worksurface supporting One high storage products.
Storage Towers
Storage and Wardrobe cabinates
Safety Glasses
Safety Glasses
Required Tools
Required Tools
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Included Hardware
#2 Screwdriver Roberson
#2 Screwdriver Roberson
Installation For Similar Products
Leveler
L007250037
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...