
•Page
globalcontract.com
80
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
Wire Manager
The wire manager can be installed either after the unit has been inverted and in posi-
tion, or while the worksurface is upside down on the fl oor.
STEP 1: Orient the extruded PVC wire manager so the opening for the wires is facing
the back of the worksurface.
STEP 2: Align the wire manager with the metal inserts located in the worksurface.
Install the six supplied 1/4-20-2” bolts into the holes and secure.
worksurface is
upside down
on the fl oor
front of the worksurface
(chair side)
back of the
worksurface
2
1
2
Wire Management
Viceversa® tables have wire management built right into the leg to neatly organize
electrical and communication cables from the worksurface to the fl oor.
Leg
STEP 1: Remove the plastic wire management cover to expose channel.
STEP 2: Lay in power and telephone cable up along leg and secure in place by snapping
back in the plastic cover.
Horizontal wire management
STEP 3: Excess cables can also be neatly stored below the worksurface from any loca-
tion within the horizontal wire management tray . Wires may also be routed from table
to table along the wire management tray
Combination wire management
STEP 4: The Dogbone tables come standard with (2) grommets in the surface for wire
management. Cables can be routed through the grommets, across the horizontal wire
manager then down the leg into wall, fl oor or electrifi ed panels.
plastic wire
management
1
2
3
4
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...