
•Page
globalcontract.com
46
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
FULL MODESTY
GABLE
GABLE
NARROW GABLE
WORKSURFACE
L2ECxxxxxxR
Blum Connector
(installed) L005650061
Bracket
L005651035
Included Hardware
Assembly
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Pick a clean unobstructed area to assemble desk. This unit is best to as-
semble upside down.
STEP 3: Determine position of left and right gables as this will determine position
of hardware.
a. Orient partial gable so that exposed holes are on back edge. Install levellers
into T nuts, using mallet install into pre-drilled holes on the bottom of gable.
Install Blum connector screws on the top and back edge into pre-drilled
holes. Note that 2 holes are available in each position, install in hole closest
to underside of the desk.
b. End gable connecting, orient with Blum connectors facing inside of desk
Install levellers into T nuts, using mallet install into pre-drilled holes on the
bottom of gable. Install Blum connector screws on the top and back edge
into pre-drilled holes. Note that 2 holes are available in each position, install
in hole closest to underside of the desk.
c. Full modesty panel. Install Blum connector screws on the top and back
edge into pre-drilled holes.
d. Full end gable, orient with Blum connectors facing inside of desk. Install
levellers into T nuts on bottom of gable. Install Blum connector screws on
the top and back edge into pre-drilled holes. Note that 2 holes are available
in each position, install in hole closest to underside of the desk.
STEP 4: Connect chassis together by lining up Blum connectors with Blum con-
nector screws on adjoining pieces. Tighten Blum connectors ¼ turn, do not over
tighten.
STEP 5: Lay worksuface on fl oor with Blum connectors facing up. Install assembled
chassis by lining up Blum connector screws with the Blum connectors on the
worksurface top. Tighten Blum connectors ¼ turn, do not over tighten.
STEP 6: Stand completed assembly upright.
STEP 7: Using the provided #8 x ¾ wood screws, secure fl at brackets to the under-
side of adjoining surfaces. The half fl at bracket is to be installed in the “cableway”
opening in the narrow gable. Install full fl at bracket half way between front edge of
surface and the front edge of the half Gable.
a. Connecter nolt and nut will be used to gang narrow gable to narrow
gable of adjoining assembly using hex wrench.
L2ECxxxxxxL
L2ECxxxxxxR
L2ECxxxxxxL
Installation For Similar Products
Required Tools
Safety Glasses
Hex Wrench
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
Leveler
L007250037
“T” Nut Insert
L007250039
Blum Connector
Screw L005650060
Flat Bracket
L005650025
Connector Bolt
L005650114
Connector Nut
L005650117
Wood Screw #8 3/4
L007250032
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...