
•Page
globalcontract.com
60
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
L2TCDxxxxxx
Assembly
Required Tools
Safety Glasses
Screwdriver #2 Robertson
Wood Screw #8 3/4
L007250032
Included Hardware
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
L2TCRxxxx
L2TCAxxxxL
L2TCPxxxxR
L2TCWxxxxxxL/R
Installation For Similar Products
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Pick a clean unobstructed area to assemble desk. This unit is best to as-
semble upside down.
STEP 3: Place worksurface face down on clean unobstructed area.
STEP 4: Place monoleg(s) as per product evenly spaced leaving overhang based on
shape of worksurface top. Using #8x 3/4 wood screws to secure to the bottom of
the surface.
STEP 5: This product is shipped with “HAT” channel support bar, install along the
bottom of the surface.
Note: Please allow room to install a keyboard tray at the users edge if needed.
STEP 6: This product is intended to gang to existing assembly. Using fl at brackets,
install with #8x 3/4 wood screws.
Left Hand Shown
Flat Bracket
L005650025
WORKSURFACE
HAT CHANNEL
MONOLEG
BHML03 (default)
or
LLSQ3X3H28
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...