INSTALLATION GUIDELINES
L2CC
Required Tools
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Safety Glasses
Hex Wrench
Blum Connector
Screw L005650060
Blum Connector
(installed) L005650061
Flat Bracket
L005650025
Connector Bolt
L005650114
Connector Nut
L005650117
Flat Bracket
L005651035
Leveler
L007250037
“T” Nut Insert
L007250039
Included Hardware
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
L2CSxxxxxx
Installation For Similar Products
Assembly
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Pick a clean unobstructed area to assemble desk. This unit is best to as-
semble upside down.
STEP 3: Determine position of left and right gables as this will determine position
of hardware.
a. Partial gables, orient so that exposed holes are on the back edge Install
levellers into T nuts, using mallet install into pre-drilled holes on the bottom
of gable. Install Blum connector screws on the top and back edge into pre-
drilled holes. Note that 2 holes are available in each position, install in hole
closest to underside of the desk.
b. Back panel one. Orient with Blum connectors facing inside of desk so
that exposed Blum connecotrs line up with Narrow gable Install levellers
into T nuts, using mallet install into pre-drilled holes on the bottom of
gable. Install Blum connector screws on the top and side edge opposite
Blum connectors, into pre-drilled holes.
STEP 4: Connect chassis together by lining up Blum connectors with Blum con-
nector screws on adjoining pieces. Tighten Blum connectors ¼ turn, do not over
tighten.
STEP 5: Lay worksuface on fl oor with Blum connectors facing up. Install assembled
chassis by lining up Blum connector screws with the Blum connectors on the
worksurface top. Tighten Blum connectors ¼ turn, do not over tighten.
STEP 6: Stand completed assembly upright.
STEP 7: Using the provided #8 x ¾ wood screws, secure fl at brackets to the under-
side of adjoining surfaces. The half fl at bracket is to be installed in the “cableway”
opening in the narrow gable. Install full fl at bracket half way between front edge of
surface and the front edge of the half Gable.
a. Connecter bolts and nuts will be used to gang narrow gable to narrow
gable of adjoining assembly using hex wrench.
GABLE
GABLE
BACK PANEL
BACK PANEL
WORKSURFACE
Wood Screw #8 3/4
L007250032
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...