
Page
•
globalcontract.com
81
• Fall 2017
GLOBAL
Contract
WIre Management with Boulevard
Modesty Panel
Viceversa tables can manage wires externally routed to and from our Boulevard panel
system.
STEP 1: With the tables adjacent to boulevard panels, power and communication can
exit the Boulevard raceway directly into the horizontal wire management tray terminating
at any location atop the worksurface.
Viceversa tables can manage wires externally routed to and from our Boulevard panel
system.
STEP 1: Place the top on the fl oor upside sown.
NOTE: Ensure there are no foreign items on the fl oor that could damage the fi nish of the
surface. It is recommended the top be places on either a padded blanket or cardboard.
STEP 2: Remove the wire management covers from the legs.
STEP 3: Place side fl anges of the modesty panel into the cavity of each leg and slide
the top of the modesty panel to the underside of the worksurface. (The modesty panel
should be oriented so that the screws are on the inside or towards the user.
STEP 4: Drive the supplied screws through the holes in the modesty panel.
STEP 5: Shorten and replace the wire management covers onto the legs.
NOTE: When ganging two tops by sharing the legs, the metal modesty panel can not be
used.
When ganging two tops with metal modesty panel, specify two fl at brackets per join.
1
INSTALLATION GUIDELINES
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...