
•Page
globalcontract.com
72
GLOBAL
Contract
• Fall 2017
Kadin Tables
Note: First assemble the depth, then assemble the width of the table.
Start at one end of the table and work your way through to the other end
STEP 1: Insert the slider into the groove. Align the slider’s hole with the diecast
support’s hole (Or plastic support’s Hole) and secure them together with the
provided screw.
STEP 1b:Plastic supports are to be used at the seams between two adjoining
table tops.
STEP 2: Attach the legs to either side of the beam with the provided screws.
STEP 3: Once one side is complete, attach the remaining beams to the
assembly and add the provided diecast supports (tables up to 48” will not
include diecast supports).
STEP 4: Each top will include metal inserts - connect the legs and supports to
the top with the provided machine screws.
Required Tools
Safety Glasses
Rubber Mallet
Drill
Allenkey 3/16”
2 Way Connector
3 Way Connector
2 Way Connector 60 Degree
Beam
Plastic Support
1/4 -20- 0.5 Screw
Diecast Support
Leg
Slider
1
1
1b
1b
Included Hardware
INSTALLATION GUIDELINES
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...