
•Page
globalcontract.com
54
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
L2CHK
Required Tools
Safety Glasses
Hex Wrench
Blum Connector
(installed) L005650061
Connector Bolt
L005650114
Connector Nut
L005650117
Bracket
L005651035
Included Hardware
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Assembly
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Pick a clean unobstructed area to assemble desk. This unit is best to as-
semble upside down.
STEP 3: Determine position of left and right gables as this will determine position
of hardware.
a. Partial gables, orient so that exposed holes are on the back edge. Install
levellers into T nuts, install into pre-drilled holes on bottom of gable using a
mallet. Install Blum connector screws on the top and only top position on
back edge into pre-drilled holes. Note that 2 holes are available in each
position, install in hole closest to underside of the desk.
b. Back panel one. Orient with Blum connectors facing inside of desk so
that exposed Blum connectors line up with partial gable. Install levellers
into T , install into pre-drilled holes on bottom of gable using a mallet.
Install Blum connector screws on the top and side edge opposite Blum
connectors, into pre-drilled holes.
STEP 4: Connect chassis together by lining up Blum connectors with Blum con-
nector screws on adjoining pieces. Tighten Blum connectors ¼ turn, do not over
tighten.
STEP 5: Lay worksuface on fl oor with Blum connectors facing up. Install assembled
chassis by lining up Blum connector screws with the Blum connectors on the
worksurface top. Tighten Blum connectors ¼ turn, do not over tighten.
STEP 6: Lay keyboard tray along front edge of main worksurface, space with 1”
gap between keyboard tray and main surface. Place keyboard mechanism in place,
centering along centerline. Screw into main surface and key board surface using
#8x3/4 wood screws provided.
STEP 7: Stand completed assembly upright.
STEP 8: Using the provided #8 x ¾ wood screws, secure fl at brackets to the under-
side of adjoining surfaces. The half fl at bracket is to be installed in the “cableway”
opening in the partial gable. Install full fl at bracket half way between front edge of
surface and the front edge of the partial Gable.
a. Connecter bolts and nuts will be used to gang partial gable to partial
gable of adjoining assembly using hex wrench.
L2CSHKxxxxxx
Installation For Similar Products
Leveler
L007250037
“T” Nut Insert
L007250039
Blum Connector
Screw L005650060
Flat Bracket
L005650025
NARROW GABLE
HALF BACK
HALF BACK
NARROW GABLE
WORKSURFACE
Wood Screw #8 3/4
L007250032
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...