
•Page
globalcontract.com
18
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
L2GRxx
Safety Glasses
Required Tools
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
Level
Included Hardware
Blum Connector
(installed) L005650061
Assembly
STEP 1: Unpack and inspect individual pieces for damages or missing hardware
STEP 2: Pick a clean unobstructed area to assemble desk. It is advisable to as-
sembly of this product upright.
STEP 3: Install provided levellers into T nut inserts on the bottom of both left and
right hand end panels as well as half gable. Install T nuts, using mallet install into
pre-drilled holes on the bottom of gable. On the back and top edge of the end
panels, install Blum connector screws in pre-drilled holes.
STEP 4: On the worksurface, install Blum Connector screws in pre-drilled holes on
the back and side edges.
STEP 5: Lay the back panel on clean unobstructed surface with Blum Connectors
facing up. On the bottom edge, install the levellers into the T nut inserts. On the
top edge, install Blum connector screws into pre-drilled holes.
a. To attach the half gable mid support, install 2 modular connector screws in the
holes provide along center line. The half gable will connect to the back panel by
lining up modular connectors to the connector screws and slide down to engage. A
mallet may be used to properly seat the half gable.
STEP 6: lay either left or right end panel on the ground with exposed Blum connec-
tors facing up. Connect the side of worksurface by lining up the Blum connector
screws to the Blum connectors. Tighten screws on Blum Connectors ¼ turn, do not
over tighten.
a. with the assistance of another person, turn assembly upright and con-
nect opposite end panel by connecting Blum Connector screws.
STEP 7: Pick up assembly of the worksurface and end gables and line up Blum
Connector screws along the back end to the Blum connectors on the Back panel.
Tighten Blum Connector screws ¼ turn, Do not over tighten. Stand Assembly
upright.
STEP 8: To install transaction top, line the Blum Connectors installed on the bottom
of the top and line up with Blum connecting screws installed on the top edges of the
assembly. Tighten Blum Connector screws ¼ turn, Do not over tighten.
STEP 9: When in fi nal position, level the unit.
Leveler
L007250037
Blum Connector
Screw L005650060
“T” Nut Insert
L007250039
Modular Connector
(installed) L004250001
HALF GABLE
GABLE
TRANSACTION TOP
BACK PANEL
WORKSURFACE
Modular Screw
L007250001
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...