
Page
•
globalcontract.com
61
• Fall 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
L2FDxxxxxx
Assembly
Required Tools
Safety Glasses
Screwdriver #2 Robertson
Included Hardware
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
L2FRxxxx
L2FAxxxxL
L2FPxxxxR
L2TCWxxxxL/R
Left Hand Shown
Installation For Similar Products
STEP 1: Unpack and inspect individual pieces for damages or missing hardware.
STEP 2: Pick a clean unobstructed area to assemble desk. This unit is best to as-
semble upside down.
STEP 3: Place worksurface face down on clean unobstructed work area.
STEP 4: Place full monolegs as per product evenly spaced leaving overhang based
on shape of worksurface top and 4 “ from front and back edge. Secure using
#8x3/4 wood screws to secure to the bottom of the surface.
STEP 5: Place small monolegs at straight end. These legs should be placed 4”
from both back and side edges. Secure using #8x3/4 wood screws to secure to the
bottom of the surface. The short legs are shipped with a 5/16 bolt installed into the
bottom.
STEP 6: This product is shipped with a “HAT” channel support bar, install along
bottom of the surface. Please note that allow room to install Keyboard tray at users
edge if needed.
STEP 7: This product is intended to support from and be ganged to Licence 1 high
storage. To connect the small legs to Licence storage, Drill 3/8” through hole in
base storage and use bolt from inside storage to line up with nutsert in bottom of
the short leg.
Wood Screw #8 3/4
L007250032
WORKSURFACE
HAT CHANNEL
LLSQ3X3
MONOLEGS
LLSQ3X3H28
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...