
•Page
globalcontract.com
2
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
Assembly Hardware - Modular Connectors
Assembly Hardware - Blum Connectors
Modular Connector (clip) and Shoulder Screw
• This connector offers a hidden connection between two panels.
• The modular connector and a connector screw are used in combination to
assemble panels.
• The modular connector is always pre-installed by the factory.
• The modular connector is always installed with the WIDE opening oriented at the
bottom of the part.
• The connecting shoulder screw is fi eld installed, based on the application of
components.
Steps to install modular connectors:
STEP 1: Install connecting shoulder screws at the pre-drilled location as per confi guration.
STEP 2: Line up shoulder screws to the modular connector in another component.
STEP 3: Push components together and push down to lock component in place,
using a rubber mallet, if necessary.
STEP 1: Install Blum Connector screws into the pre-drilled holes.
STEP 2: Line Blum connector screws to the exposed Blum Connectors
STEP 3: On the bottom of the surface turn the screw on Blum Connector ¼ turn, do
not over tighten.
Modular Connector (clip)
Shoulder Screw
Assembly Hardware - Handels, Elbow Catch
Door / Drawer Handle
Install the handle(s) in the predrilled holes on the
doors or drawers by using the screws provided.
Elbow Catch
Install the elbow catch on the left hand door at
the upper right corner with the screws provided.
Assembly Hardware - Joint Conncetor
This type of connector is used to attach the extrusion to the 1” end gables.
Steps to install connectors:
STEP 1: Press nut connector into pre-drilled hole of end gable from the exterior side
of the end gable.
STEP 2: Push bolt into extrusion holes.
STEP 3: Screw the nut and bolt together.
Joint Connector Nut
Joint Connector Bolt
1
1
2
3
2
3
Содержание Licence 2
Страница 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Страница 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Страница 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Страница 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Страница 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Страница 26: ...Page globalcontract com 25 Fall 2017 GLOBALContract INSTALLATION GUIDELINES SPACER BOLT 6 7 7a 7b 8 9 5 4 3b 3a...
Страница 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Страница 58: ...Page globalcontract com 57 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 4a 4c 5 3 3b 4b 3a...
Страница 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Страница 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...