Section 4 • Scheduled Maintenance Procedures
Part No. 62401
S-100 & S-105 & S-120 & S-125
4 - 15
January 2010
REV A
A-13
Perform Engine Maintenance -
Deutz Models
Engine specifications require that
this one-time procedure be
performed after the first 50 hours.
Required maintenance procedures and additional
engine information are available in the
Deutz F4L913 Operation Manual
(Deutz part number 0297 9690).
Deutz F4L913 Operation Manual
Genie part number
62446
To access the engine:
1 Remove the engine tray retaining fastener
located under the engine tray. Swing the engine
tray out and away from the machine.
2 Install the fastener that was just removed
through the engine tray and into the engine tray
anchor hole in the turntable.
Crushing hazard. Failure to install
the fastener into the engine tray
anchor hole to secure the engine
tray from moving could result in
death or serious injury.
A-14
Grease the Turntable Rotation
Bearing and Rotate Gear
Genie specifications require that
this procedure be performed every
100 hours of operation. Perform
this procedure more often if dusty
conditions exist.
Frequent application of lubrication to the turntable
bearing and rotate gear is essential to good
machine performance and service life. Continued
use of an improperly greased bearing and gear will
result in component damage.
1 Locate the grease fitting below the ground
control box.
2 Pump grease into the turntable rotation bearing.
Rotate the turntable in increments of 4 to 5
inches / 10 to 13 cm at a time and repeat this
step until the entire bearing has been greased.
3 Apply grease to each tooth of the drive gear,
located under the turntable.