Part No. 62401
Genie S-100 • S-105 • S-120 • S-125
7 - 41
Section 7 • Repair Procedures
First Edition • First Printing
13 Remove the upper plate and actuator pivot pin.
Do not remove the cable break limit switch from
the mounting plate.
14 Push the cable break actuator and cables
towards the platform end of the boom
approximately 18 inches / 46 cm.
15 Remove the red cable adjustment locking
bracket retaining fasteners. Remove the red
locking bracket from the machine.
Bodily injury hazard. Failure to
install the red cable adjustment
locking bracket will allow the cable
mounting bolts to loosen and fall
out which could result in death or
serious injury.
a
red cable adjustment
locking bracket
16 Remove the two cable adjustment bolts.
17 Remove the cable-end block mounting plate
fasteners. Remove the cable-end block
mounting plate from the machine.
18 Remove the trunnion pin retaining fasteners.
19 Use a slide hammer to remove the trunnion pins
from the primary boom extension cylinder.
20 Remove the primary boom extension cylinder
hold down brackets at the pivot end of the
boom.
21 Attach a lifting strap from an overhead crane to
the lifting eye on the primary boom extension
cylinder.
22 Support and slide the primary boom extension
cylinder out of the boom assembly while guiding
the cables out of the boom and place it on a
structure capable of supporting it.
Crushing hazard. The primary
boom extension cylinder may
become unbalanced and fall when
it is removed from the boom if it is
not properly supported and
attached to the overhead crane.
Component damage hazard.
Cables can be damaged if they
are kinked or pinched.
During removal, the overhead
crane strap will need to be
adjusted for proper balancing.
23 Remove the retaining fasteners from the limit
switch cover on top of the number 2 boom tube
at the platform end of the machine.
BOOM COMPONENTS
Содержание S-100
Страница 1: ......