Section 4 • Scheduled Maintenance Procedures
4 - 8
S-100 & S-105 & S-120 & S-125
Part No. 62401
REV A
January 2010
A-3
Perform Function Tests
Genie requires that this procedure
be performed daily.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information to perform this procedure is
available in the appropriate operator's manual. Refer
to the Operator's Manual on your machine.
A-2
Perform Pre-operation
Inspection
Genie requires that this procedure
be performed daily.
Completing a pre-operation inspection is essential
to safe machine operation. The pre-operation
inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently wrong
with a machine before the operator performs the
function tests. The pre-operation inspection also
serves to determine if routine maintenance
procedures are required.
Complete information to perform this procedure is
available in the appropriate operator's manual. Refer
to the Operator's Manual on your machine.
CHECKLIST
A
PROCEDURES