Section 4 • Scheduled Maintenance Procedures
Part No. 62401
S-100 & S-105 & S-120 & S-125
4 - 47
January 2010
REV B
CHECKLIST
C
PROCEDURES
C-6
Test the Platform Overload
System (if equipped)
Genie specifications require that
this procedure be performed every
500 hours or 6 months, whichever
comes first.
Testing the platform overload system regularly is
essential to safe machine operation. Continued use
of an improperly operating platform overload
system could result in the system not sensing an
overloaded platform condition. Machine stablity
could be compromised resulting in the machine
tipping over.
Perform this procedure with the
machine on a firm, level surface.
1 Turn the key switch to platform control. Start the
engine and level the platform.
2 Determine the maximum platform capacity.
Refer to the machine serial plate.
3 Remove all weight, tools and accessories from
the platform.
Failure to remove all weight, tools
and accessories from the platform
will result in an inaccurate test.
C-5
Grease the Platform Overload
Mechanism (if equipped)
Genie specifications require
that this procedure be performed
every 500 hours or 6 months,
whichever comes first. Perform
this procedure more often if dusty
conditions exist.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
1 Locate the grease fittings on each pivot pin of
the platform overload assembly.
2 Thoroughly pump grease into each grease fitting
using a multipurpose grease.