
Part No. 62401
Genie S-100 • S-105 • S-120 • S-125
7 - 18
Section 7 • Repair Procedures
First Edition • First Printing
PLATFORM COMPONENTS
How to Bleed the Platform
Leveling Cylinder
Do not start the engine. Use
auxiliary power for all machine
functions in this procedure.
The boom must remain below 10°
to properly perform this procedure.
1 Raise the boom to a horizontal position.
2 Activate auxiliary power.
3 Push the platform level up and down buttons
through two complete platform leveling cycles
to remove any air that might be in the system.
2-3
Platform Rotator
The platform rotator is a hydraulically activated
helical gear assembly used to rotate the platform
160 degrees.
How to Remove the
Platform Rotator
Component damage hazard. Mark
the platform mounting weldment
and the rotator flange before
removing the platform mounting
weldment. The platform mounting
weldment must be replaced in the
exact same position on the rotator
flange as it was before removal. If
a new rotator is installed or the
rotator is disassembled, proper
alignment can be achieved by
rotating the rotator all the way to
the left and then installing the
platform mounting weldment all
the way in the left position.
When removing a hose assembly
or fitting, the O-ring on the fitting
and/or hose end must be replaced
and then torqued to specification
during installation.
Refer to Section Two,
Hydraulic
Hose and Fitting Torque
Specifications.
1 Remove the platform. See 2-1,
How to Remove the Platform.
Содержание S-100
Страница 1: ......