![Froling TURBOMAT TM 150 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/froling/turbomat-tm-150/turbomat-tm-150_installation-instructions-manual_2338754051.webp)
❒ Fit the FGR duct with the connecting bracket (1) to the boiler.
❒ Wrap the heat insulation mat (2) around the connecting bracket and fix in place
using spring clips.
❒ Insert the heat insulation mat (3) on the front of the connecting bracket.
❒ Remove the pre-punched cut-out for the flange from the heat insulation (1).
➥ Keep the heat insulation, you will need it later.
❒ Wrap the heat insulation mat (2) around the upper FGR duct and fix in place using
spring clips at the bottom.
❒ Wrap the heat insulation mat (3) around the lower FGR duct and fix in place using
spring clips at the top.
Version with heat exchanger on the right:
Version with heat exchanger on the left:
❒ Assemble the cover for the connecting bracket.
❒ Press in the bottom clamp.
Installation
4
Installing the boiler
Installation Instructions | M0650314_en
51