![Froling TURBOMAT TM 150 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/froling/turbomat-tm-150/turbomat-tm-150_installation-instructions-manual_2338754029.webp)
❒ Fit the insulation side panel to the front, left hand side of the combustion chamber.
➥ Fix it to base frame at the frame with four screws.
❒ Fit the insulation side panel to the back, left hand side of the combustion chamber.
❒ When you have finished fitting all the side panels, check that they fit correctly.
➥ Check that the insulation side panels are flush and check that there are no
gaps between the insulation side panels.
➥ If necessary, slightly loosen the fixing the panels to the base frame, adjust and
align the insulation side panels and then re-tighten the screws.
4.5.8 Fitting the ash cans to the heat exchanger ash removal unit
❒ Fit the blanking plate (1) complete with the seal gasket (2) to the flange plate (3).
❒ Fit both flange plates to the back of the heat exchanger.
❒ Fitting the cover
❒ Push the ash cans (1) into the front of the heat exchanger and fix in place with the
star-grip screws (2).
❒ Fit the cover (3) above the ashcan.
Installation
4
Installing the boiler
Installation Instructions | M0650314_en
29