![Froling TURBOMAT TM 150 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/froling/turbomat-tm-150/turbomat-tm-150_installation-instructions-manual_2338754021.webp)
4.5.4 Installing the combustion chamber firebricks
❒ Remove the front cover (1) and the back cover (2) from the heat exchanger.
❒ Pass the ceramic fibre mats through the opening in the heat exchanger and lay
them in the combustion chamber as shown in the figure.
➥ Ensure that you lay two mats alongside each other on the heat exchanger side.
Installation
4
Installing the boiler
Installation Instructions | M0650314_en
21