![Froling TURBOMAT TM 150 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/froling/turbomat-tm-150/turbomat-tm-150_installation-instructions-manual_2338754036.webp)
❒ Fit the ash removal unit flange with seal on the right of the combustion chamber.
❒ Fit the cover (1) for the ash removal unit flange.
❒ Fit the safety switch (2) to the bracket (3).
❒ Fit the bracket (3) to the insulation side panel.
❒ Bend the clamp (4) over the insulation side panel. Lay the safety switch cable to
the control cabinet.
4.5.11 Fitting the control cabinet
❒ Hang the control cabinet (1), with the fixing bolts (2) provided (flat-head bolts in
the control cabinet packaging), in the locating slots (3) in the insulation side panel.
❒ Open the control cabinet door. Fix the bottom corners of the control cabinet to the
insulation side panel.
❒ Fit the cable duct (4) on top of the control cabinet.
4
Installation
Installing the boiler
36
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com