4 Installation
4.1 Transport
NOTICE
Damage to components if handled incorrectly
❒ Follow the transport instructions on the packaging.
❒ Transport components with care to avoid damage
❒ Protect the packaging against damp
❒ Unloading, positioning and installation should only be performed by trained
professionals! Staff must be trained in techniques for moving heavy loads
(correct tools and lifting equipment, hooking and slinging points, etc.)
4.2 Positioning
❒ Secure the slings or chains to the hooking point securely and position the boiler
4.3 Temporary storage
If the system is to be assembled at a later stage:
❒ Store components at a protected location, which is dry and free from dust
➥ Damp conditions and frost can damage components, particularly electric ones!
4.4 Setting up in the boiler room
4.4.1 Moving the boiler in the boiler room
❒ Position a fork-lift or similar lifting device with a suitable load-bearing capacity at
the base frame
❒ Lift and transport to the intended position in the installation room
➥ Observe the minimum distances in the boiler room.