4. Commissioning
4-23
Festo P.BE-SPC11-SYS-ASI-EN en 0203NH
Overview of the commissioning sequence on the
SPC11
Set the parameters and start the automatic teach procedure
(SPC11 in status as at delivery)
Switching on
Set
system parameters
Set
amplification stage
Set
cushioning stage
Set the value with +/- .
Conclude entry with
Enter.
The SPC11 waits for the
teach task
Pre-commissioning
is concluded.
The teach task can
be started.
The teach procedure
is carried out
The teach task is concluded successfully.
The mass will be
pressed against the
end position.
O1 supplies a 1-signal.
P.03 and P.04 can be
taught (see next page).
The t flashes.
The dots flash.
Enter button
Enter button
Enter button
Teach button/input
Firmware version number
Display of
firmware version
Wait approx. 0.5 second
Fig. 4/3: Set the parameters and start the teach procedure
Содержание Soft Stop SPC11 Series
Страница 2: ......
Страница 14: ...Contents and general instructions XII Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 15: ...Summary of components 1 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 1 ...
Страница 25: ...Fitting 2 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 2 ...
Страница 26: ...2 Fitting 2 2 Festo P BE SPC11 SYS ASI EN en 0203NH Contents 2 Fitting 2 1 2 1 Fitting the SPC11 2 3 ...
Страница 28: ...2 Fitting 2 4 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 29: ...Installation 3 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 3 ...
Страница 61: ...Commissioning 4 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 4 ...
Страница 100: ...4 Commissioning 4 40 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 101: ...Diagnosis and error treatment 5 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 5 ...
Страница 114: ...5 Diagnosis and error treatment 5 14 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 115: ...Operating the SPC11 in accordance with slave pro file 7 4 A 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix A ...
Страница 127: ...Technical appendix B 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix B ...