4. Commissioning
4-28
Festo P.BE-SPC11-SYS-ASI-EN en 0203NH
4.4.1 Switch-on behaviour after successful commissioning
If commissioning has already been carried out, the SPC11 is
ready to operate after a few seconds.
Start: Switch-on
behaviour
Display of
system parameters
Display of
amplification stage
Display of
cushioning stage
Position
P.01 or P.02?
SPC11 is ready to operate.
The axis is pressed actively
into the end position and waits
for the positioning task.
SPC11 is ready to operate.
The axis stands uncontrolled
and waits for the positioning
task.
Yes
No
Wait approx. 1 second
Wait approx. 1 second
Wait approx. 1 second
Current value
Current value
Current value
Firmware version
number
Display of
firmware version
Wait approx. 0.5 second
Fig. 4/5: Switching-on behaviour of the SPC11 after commissioning
Содержание Soft Stop SPC11 Series
Страница 2: ......
Страница 14: ...Contents and general instructions XII Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 15: ...Summary of components 1 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 1 ...
Страница 25: ...Fitting 2 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 2 ...
Страница 26: ...2 Fitting 2 2 Festo P BE SPC11 SYS ASI EN en 0203NH Contents 2 Fitting 2 1 2 1 Fitting the SPC11 2 3 ...
Страница 28: ...2 Fitting 2 4 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 29: ...Installation 3 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 3 ...
Страница 61: ...Commissioning 4 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 4 ...
Страница 100: ...4 Commissioning 4 40 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 101: ...Diagnosis and error treatment 5 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 5 ...
Страница 114: ...5 Diagnosis and error treatment 5 14 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 115: ...Operating the SPC11 in accordance with slave pro file 7 4 A 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix A ...
Страница 127: ...Technical appendix B 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix B ...