
4. Commissioning
4-9
Festo P.BE-SPC11-SYS-ASI-EN en 0203NH
4. Hold the Enter key pressed down for at least 2 seconds.
(
>
2 s). The value will then be transferred to the SPC11
and the cushioning stage will be shown (here 0). This is
shown by the letter C (
C
ushioning stage).
(C.00)
5. Now set the desired cushioning stage with the b/-
(see axis-specific supplement), e.g. 04.
(C.04)
6. Hold the Enter key pressed down for at least 2 seconds.
(
>
2 s). The value will then be transferred to the SPC11
and the system parameter will be shown (here 0).
(S.00)
7. Now set the system parameter valid for your structure
with the b/- (see axis-specific supplement),
e.g. 01.
(S.01)
8. Hold the Enter key pressed down for at least 2 seconds.
(
>
2 s). The value will then be transferred to the SPC11
and the readiness to carry out the teach procedure will be
indicated by a flashing “t.” The three parameters are then
saved and pre-parametrizing (in the office) is completed.
The t flashes.
When all prerequisites for carrying out the teach procedure
have been made (see sections 4.3.1), the teach procedure
can be started (see sections 4.3.2).
9. If you wish to conclude pre-commissioning, switch off the
operating voltage.
Содержание Soft Stop SPC11 Series
Страница 2: ......
Страница 14: ...Contents and general instructions XII Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 15: ...Summary of components 1 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 1 ...
Страница 25: ...Fitting 2 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 2 ...
Страница 26: ...2 Fitting 2 2 Festo P BE SPC11 SYS ASI EN en 0203NH Contents 2 Fitting 2 1 2 1 Fitting the SPC11 2 3 ...
Страница 28: ...2 Fitting 2 4 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 29: ...Installation 3 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 3 ...
Страница 61: ...Commissioning 4 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 4 ...
Страница 100: ...4 Commissioning 4 40 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 101: ...Diagnosis and error treatment 5 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 5 ...
Страница 114: ...5 Diagnosis and error treatment 5 14 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 115: ...Operating the SPC11 in accordance with slave pro file 7 4 A 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix A ...
Страница 127: ...Technical appendix B 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix B ...