
4. Commissioning
4-19
Festo P.BE-SPC11-SYS-ASI-EN en 0203NH
Output bit O1 supplies a 1-signal. The drive is now ready for
operation.
When the teach procedure is concluded, the SPC11 knows
the locations of the mechanical end positions (P.01...P.02).
You can now teach manually the intermediate positions
(P.03...P.04) or trigger a positioning task to the end positions
(P.01...P.02).
Содержание Soft Stop SPC11 Series
Страница 2: ......
Страница 14: ...Contents and general instructions XII Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 15: ...Summary of components 1 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 1 ...
Страница 25: ...Fitting 2 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 2 ...
Страница 26: ...2 Fitting 2 2 Festo P BE SPC11 SYS ASI EN en 0203NH Contents 2 Fitting 2 1 2 1 Fitting the SPC11 2 3 ...
Страница 28: ...2 Fitting 2 4 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 29: ...Installation 3 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 3 ...
Страница 61: ...Commissioning 4 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 4 ...
Страница 100: ...4 Commissioning 4 40 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 101: ...Diagnosis and error treatment 5 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 5 ...
Страница 114: ...5 Diagnosis and error treatment 5 14 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Страница 115: ...Operating the SPC11 in accordance with slave pro file 7 4 A 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix A ...
Страница 127: ...Technical appendix B 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix B ...