
EtherSAM Test Setup and Results
NetBlazer
53
Ramp Configuration
Dynamic Ramp
The graphic displays the percentage of each CIR level step in time.
Step Time
The step time represents the test duration for each ramp step (from 5 to 60
seconds).
Ramp Duration
The ramp duration indicates the total time required to perform all the ramp
steps for each service.
Add Step
Add button allows to add a new ramp step. To add a new ramp step, press
the
Add
button and enter the CIR percentage.
Note:
Maximum of 7 pre CIR steps can be added in the Ramp configuration.
Note:
The step is added in terms of % of CIR.
Содержание FTB-860
Страница 1: ...User Guide FTB 860 880 NetBlazer Series for FTB 1 Ethernet Packet Sync FC Wireless Test Applications...
Страница 7: ...NetBlazer vii B Glossary 371 Acronym List 371 VLAN 379 1588 PTP 380 SyncE 385...
Страница 12: ......
Страница 16: ......
Страница 20: ......
Страница 30: ......
Страница 84: ......
Страница 110: ......
Страница 122: ......
Страница 152: ......
Страница 166: ......
Страница 182: ......
Страница 192: ......
Страница 224: ......
Страница 366: ......
Страница 376: ......
Страница 382: ...Specifications 370 FTB 860 880 Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s...
Страница 390: ...Glossary 378 FTB 860 880 Acronym List W WAN Wide Area Network WIS WAN Interface Sublayer WWN World Wide Name...