Proline t-mass 65 PROFIBUS DP
Commissioning
47
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist for “Post-installation check”
• Checklist for “Post-connection check”
6.2
Switching on the measuring device
Once the post-connection checks have been successfully completed, it is time to switch on the
supply voltage. The device is now operational.
The measuring device performs a number of power on self-tests. As this procedure progresses the
following sequence of messages appears on the local display:
Normal measuring mode commences as soon as start-up completes.
Various measured values and/or status variables appear on the display (HOME position).
!
Note!
If start-up fails, an error message indicating the cause is displayed.
t-mass 65
START-UP
Start-up message
▼
t-mass 65
PROFIBUS DP
Shows the input/output modules
▼
DEVICE SOFTWARE
V XX.XX.XX
Current software version
▼
SYSTEM OK
→
OPERATION
Beginning of normal measuring mode
▼
Содержание Proline t-mass 65 PROFIBUS DP
Страница 2: ......
Страница 46: ...Operation Proline t mass 65 PROFIBUS DP 46 ...
Страница 106: ...www endress com worldwide BA113D 06 en 02 06 71021608 FM SGML6 0 ProMoDo ...