Proline t-mass 65 PROFIBUS DP
Installation
27
Pipe mounting
The assembly should be performed by following the instructions in the diagram.
"
Caution!
If a warm pipe is used for installation, make sure that the housing temperature does not exceed the
max. permitted value of +60 °C (+140 °F).
a0001132-ae
Fig. 19:
Pipe mounting (wall-mount housing)
3.3.3
Turning the local display
1.
Unscrew cover of the electronics compartment from the transmitter housing.
2.
Press the side latches on the display module and remove the module from the electronics
compartment cover plate.
3.
Rotate the display to the desired position (max. 4 x 45 ° in both directions), and reset it onto
the electronics compartment cover plate.
4.
Screw the cover of the electronics compartment firmly back onto the transmitter housing.
a0001892
Fig. 20:
Turning the local display (field housing)
Ø 20…70
(Ø 0.79…2.75)
~
~ 6.1)
155 (
mm (inch)
4 x 45°
Содержание Proline t-mass 65 PROFIBUS DP
Страница 2: ......
Страница 46: ...Operation Proline t mass 65 PROFIBUS DP 46 ...
Страница 106: ...www endress com worldwide BA113D 06 en 02 06 71021608 FM SGML6 0 ProMoDo ...