EM TEST (Switzerland) GmbH
PFM 200N100.1
User’s Guide
Ver. 1.12
22 / 43
7.
E-10 Short Interrupts According to LV 124 (2013-02)
The test E10 consists of two test cases.
The tests simulate the condition where the component experiences short dropouts of various durations.
Block Diagram
Figure 7.1 shows the block diagram of how
the test setup is arranged according to
Figure 12 in the OEM standard LV 124.
Switch S1 interrupts the power supply to the
DUT. Depending on the test case, switch
S2, including the required <100 m
Ω load, is
activated.
Figure 7.1: Block Diagram of E-10 Short Interruptions (LV 124)
EM TEST Solution for Testing of LV 124
Figure 7.2 shows a general test setup to test E-10 using EM Test Generators.
The PFM 200N100.1 has the integrated
switches S1 and S2 switches. Switch S2
discharges the DUT with an impedance of
<100 m
Ω incl. switch.
Figure 7.2: Test Setup Using EM TEST Generators