Standard Tests with Multiple Steps
The LV standards require for each DUT multiple
sequences of tests in AutoWave.control
-
Individual
select each individually or
-
All Test Sequences Together
as shown in
the test sequence is shown in Figure
6.3marked in grey.
The first test step in the list contains a
sequence of all 5 test steps.
Additional settings for the user of the software
ma
y be found in the AutoWave.control user’s
guide.
Figure 6.3 Selecting the Sequence for E-10
Choosing
Select
will select the test and load it in the test window.
6.2.
SW Settings for the PFM 200N100.1 Switch
6.2.1. SW Settings Switch S1
Both S1N and S1P will interrupt the battery
voltage from the DUT. The PFM 200N100.1 has
the following settings for
Switched Line
(Figure
6.4) for dropout testing:
Positive (S1P)
The switch in the positive line will be interrupted
the positive supply voltage during the dropout
test.
Negative (S1N)
The return line of the supply voltage will be
interrupted during the dropout test. The DUT still
has the positive supply voltage connected.
Therefore, depending on switching, it is possible
that the DUT stays powered on.
Positive (S1P) + Negative (S1N)
Both switches will be interrupted at the same
time. The DUT is isolated during this time, but
should still be connected to ground in any case.
Figure 6.4: Switched Line Setting