EM TEST (Switzerland) GmbH
PFM 200N100.1
User’s Guide
Ver. 1.12
28 / 43
7.3.2. Test Setup for Reference Measurement
For the verification the power resistors are connected at the front side of the PFM 200N100.1. Make sure to
connect correct the HIGH and LOW terminals. Use low inductive resistance components.
CAUTION
Connecting the CA LV124-Pxx Loads
The
BNC Connection
of the connected
CA LV124-Pxx must
be at the top.
Mounting the incorrect orientation may result in a short
between oscilloscope earth and the positive supply terminal!
Figure 7.13
Test Setup
Figure 7.14: Test setup Verification Schematic
Figure 7.15: Example Verification setup with PFM 200N100.1, CA
LV124-P1R and Scope
7.3.3. Example Reference Measurement
The rise time with a test load of 100 Ω (±5 %) and 1 Ω (±5 %) must be performed and documented.
Parameters
Value
Tolerance
Fall Time tf
<= 1
s
<=0.1 x t1
(t1=10
s)
Rise Time tr
<= 1
s
<=0.1 x t1
(t1=10
s)
Load resistor 1
Ω
Load resistor 100
Ω
Figure 7.16: Reference measurement load 1
Ω
Figure 7.17: Reference measurement load 100
Ω
Typical results:
Rise Time tr:
342 ns
Fall Time tf:
137 ns
Typical results:
Rise Time tr:
35 ns
Fall Time tf:
158 ns