4 Technical features
4.6 Storing the station configuration
XI/ON: XNE-GWBR-2ETH-IP
09/2011 MN05002007Z-EN
www.eaton.com
47
4.6
Storing the station configuration
4.6.1
DIP-switch CFG
The DIP-switch "CFG" at the gateway serves to take-over the Current Configuration of the
XI/ON-station as Required Configuration to the gateway’s non-volatile memory.
Switching from OFF to ON starts the storage of the Current Configuration as the Required
Configuration (Reference configuration).
Procedure:
Switching the DIP-switch "CFG" from OFF to ON
→
Starting of the storage process
→
LED IOs flashes green (1 HZ)
→
LED IOs shortly lits up orange
→
storage process active
→
set back the DIP-switch from ON to OFF
→
storage process terminated successfully, if the LEDs IOs and GW are constant green.
Figure 32:
DIP-switch for
storing the
current station
configuration
Note
If the DIP-switch is not set back, the gateway will continiously restart the storage
process. Only setting the switch back from ON to OFF will terminate this process.
Содержание XN-GW Series
Страница 1: ...09 2011 MN05002007Z EN User Manual XI ON XNE GWBR 2ETH IP Gateway...
Страница 8: ...Table of contents 8 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com 10 Index 205...
Страница 12: ...1 About this manual 1 3 Overview 12 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...
Страница 28: ...3 EtherNet IP 3 1 System description 28 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...
Страница 184: ...7 Guidelines for station planning 7 7 Firmware download 184 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...
Страница 204: ...9 Appendix 9 3 Glossary 204 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...