7 Guidelines for station planning
7.1 Module arrangement
174
XI/ON: XNE-GWBR-2ETH-IP
09/2011 MN05002007Z-EN
www.eaton.com
7.1.3
Complete planning
The planning of a XI/ON station should be thorough to avoid faults and increase operating reli-
ability.
The power to XI/ON systems is supplied from a common external source. This avoids the
occurrence of potential compensating currents within the XI/ON station.
Attention
If there are more than two empty slots next to one another, the communication is
interrupted to all following XI/ON modules.
Содержание XN-GW Series
Страница 1: ...09 2011 MN05002007Z EN User Manual XI ON XNE GWBR 2ETH IP Gateway...
Страница 8: ...Table of contents 8 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com 10 Index 205...
Страница 12: ...1 About this manual 1 3 Overview 12 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...
Страница 28: ...3 EtherNet IP 3 1 System description 28 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...
Страница 184: ...7 Guidelines for station planning 7 7 Firmware download 184 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...
Страница 204: ...9 Appendix 9 3 Glossary 204 XI ON XNE GWBR 2ETH IP 09 2011 MN05002007Z EN www eaton com...